China’s CATL Announces Breakthrough EV Battery with 5-Minute Charging

Contemporary Amperex Technology Co Ltd has developed a second-generation Shenxing lithium iron phosphate (LFP) battery that can add 323 miles of range in five minutes, the company announced at Auto Shanghai on Monday.

The world’s largest battery maker demonstrated technology that charges from 5% to 80% in 15 minutes, surpassing rival BYD Co Ltd’s Super-e Platform, which offers 248 miles of range in similar charging time.

The system maintains 93% capacity at temperatures ranging from -30°C to +30°C (-22°F to +86°F) and operates at a 12C charging rate, according to company specifications.

Silver47 Exploration Inc. — sponsored Sponsored · Silver47 Exploration Inc.

CATL’s integrated sodium-ion technology is capable of delivering 124 miles of range in plug-in hybrids and 310 miles in fully electric vehicles, company representatives said.

The battery design incorporates dual-engine aircraft principles and features graphite-free anodes, which the company says improve temperature resistance compared to conventional lithium-ion batteries.

“The new batteries are promised to deliver [sic] around 200km of range for hybrid vehicles, and 500km for an EV,” CATL documentation states. The company has indicated the batteries are ready for commercialization but has not disclosed specific delivery dates or pricing.

Tesla‘s (Nasdaq: TSLA) quarterly earnings call on Tuesday is expected to address competitive battery technology developments, as Tesla’s current charging systems reach comparable speeds in limited temperature conditions.

CATL confirmed it has no immediate plans to sell directly in the United States, where Chinese auto imports face 100% tariffs.


Information for this story was found via the sources and companies mentioned. The author has no securities or affiliations related to the organizations discussed. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

One Response

  1. Loading a 50 KW battery in 5 minutes means a transmission of 600 KW!!! Only large buildings and factories have such a grid connection.

    It is a nice excercise without a benefit.

Video Articles

The Gold & Copper Stocks Everyone Keeps Asking About | Oct. 12-16 – Weekly Mining Mailbag

Similar Gold Mines Are Valued 10X Higher. Why Not This One? | JW Dumont – Granada Gold Mine

The US Interest Bill Gold Can’t Ignore | Peter Grandich

Recommended

First Majestic Produces 3.4 Million Ounces of Silver in Q3 2026, Jerritt Canyon Restart Remains on Track

Altamira Gold Drills 134 Metres of 0.5 g/t Gold at Maria Bonita, Hole Ends in Mineralization

Related News

Lithium Americas Enters Bidding War For Millennial Lithium

Lithium appears to be hot again. Lithium Americas Corp (TSX: LAC) this morning began a...

Monday, November 1, 2021, 08:38:25 AM

China Is Exporting Cars at a Record Pace, Even as Its Own Car Buyers Disappear

Vehicle exports jumped 69% in May as domestic car sales fell for an eighth straight...
Wednesday, July 8, 2026, 05:39:53 AM

Private EV Developer Bollinger Motors Exits Pickup Truck and SUV Business Despite 30,000 Pre-Orders

On January 14, 2022, the private start-up electric vehicle (EV) manufacturer Bollinger Motors announced it...

Sunday, January 16, 2022, 09:00:00 AM

General Motors Announces Another Extremely Costly Bolt Electric Vehicle Recall; Negative Implications for EV Industry

After the market close on Friday, August 20 (a typical timeslot when companies release bad...

Saturday, August 28, 2021, 01:02:00 PM

Dodge Unveils Concept For First-Ever EV And It’s A Loud One

Is it even a muscle car if the engine doesn’t roar? Last Wednesday, the 108-year-old...

Friday, August 26, 2022, 03:27:00 PM