Pure Gold Hits 296.1 G/T Gold Over 4.9 Metres In Underground Drilling

Pure Gold Mining (TSXV: PGM) has released results from its ongoing drill program at its flagship Pure Gold Mine in Red Lake, Ontario. Highlights from the program include 296.1 g/t gold over 4.9 metres including 1,147.1 g/t gold over 1.2 metres from underground drilling, as well as 66.3 g/t gold over 1.0 metre from surface drilling.

The company continues to complete ongoing surface exploration at the property as it looks to further expand its mineral resources. The company is targeting both resource upgrades and expansions outside of the current mineral reserves. Underground, the company continues with stope delination drilling in areas targeted for both gold production and first ore delivery from the mine.

Underground drilling is expected to continue for the life of the mine, as the company continually looks to extend mineralization from planned stopes, while also confirming stopes planned for mineralization. On the surface, drilling is expected to continue via two surface rigs, with over 30,000 metres planned for 2021.

Highlights from the underground program include the following.

Hole IDFrom (m)To (m)Length (m)Gold (g/t)Method
PGB-15424.024.50.511.0Core
PGB-15914.214.70.56.9Core
PGB-16510.713.52.818.7Core
Including12.012.70.765.4 
PGB-17018.821.02.240.0Core
Including20.121.00.994.1 
PGB-1780.06.76.711.1Core
Including0.51.61.117.0 
And Including2.93.81.010.5 
And Including5.96.70.826.4 
PGL-00031.28.57.3198.0Test
Including3.78.54.9296.1 
Including3.74.91.21,147.1 
PGL-00054.96.11.210.1Test

Highlights from the surface program meanwhile contain the following. All surface drilling reported this morning is from the Wedge zone, which is located just under three kilometres by road to the south of the firms processing facility. The zone is viewed as a southwest extension of the current mineral system with the overall structure believed to extend over more than seven kilometres.

  • 66.3 g/t gold over 1.0 metre from drill hole PG20-769;
  • 24.3 g/t gold over 1.0 metre from drill hole PG20-775;
  • 20.5 g/t gold over 1.0 metre from drill hole PG20-766;
  • 16.6 g/t gold over 1.5 metres from drill hole PG20-767;
  • 11.4 g/t gold over 2.0 metres from drill hole PG20-773.

Pure Gold Mining last traded at $2.30 on the TSX Venture.


Information for this briefing was found via Pure Gold Mining and Sedar. The author has no securities or affiliations related to this organization. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

Video Articles

Why the Market May Be Misreading Iran | David Woo

Why US Fertilizer Supply Could Matter a Lot More Now | Pat Varas – Sage Potash

Roscan Gold: Mali Discount Hits Kandiole PEA

Recommended

Silver47 Kicks Off 7,000-Meter Drill Campaign at Nevada’s Hughes Project

CBS News Cuts Staff and Shuts Radio Network in Early Bari Weiss Era

Related News

Gary Wagner: Silver is Ripe to Move Higher – The Daily Dive

For the last episode of The Daily Dive this week, we sit down with Gary...

Friday, February 5, 2021, 01:30:00 PM

Exploits Obtains Drill Permits For Little Joanna Veins Prospect

Exploits Discovery (CSE: NFLD) has received additional permits for its planned 2021 drill programs. The...

Tuesday, April 13, 2021, 09:01:35 AM

New Found Gold Discovers Additional Gold Zone Following Sampling At Queensway

It appears that New Found Gold’s (TSXV: NFG) Queensway property in Newfoundland is simply swimming...

Thursday, September 23, 2021, 07:52:32 AM

Central Bank Gold-Buying In 2022 Was at A 55-Year High, WGC Says

Central banks broke a 55-year gold-buying record in 2022. The gold rush, which is likely...

Wednesday, February 1, 2023, 02:17:00 PM

Monterrey Minerals Announces 2020 Exploration Program At Alicia Project

Monterey Minerals (CSE: MREY) revealed its 2020 exploration plans at its flagship Alicia high-grade gold...

Monday, June 8, 2020, 09:32:30 AM