Pure Gold Hits 296.1 G/T Gold Over 4.9 Metres In Underground Drilling

Pure Gold Mining (TSXV: PGM) has released results from its ongoing drill program at its flagship Pure Gold Mine in Red Lake, Ontario. Highlights from the program include 296.1 g/t gold over 4.9 metres including 1,147.1 g/t gold over 1.2 metres from underground drilling, as well as 66.3 g/t gold over 1.0 metre from surface drilling.

The company continues to complete ongoing surface exploration at the property as it looks to further expand its mineral resources. The company is targeting both resource upgrades and expansions outside of the current mineral reserves. Underground, the company continues with stope delination drilling in areas targeted for both gold production and first ore delivery from the mine.

Underground drilling is expected to continue for the life of the mine, as the company continually looks to extend mineralization from planned stopes, while also confirming stopes planned for mineralization. On the surface, drilling is expected to continue via two surface rigs, with over 30,000 metres planned for 2021.

Highlights from the underground program include the following.

Hole IDFrom (m)To (m)Length (m)Gold (g/t)Method
PGB-15424.024.50.511.0Core
PGB-15914.214.70.56.9Core
PGB-16510.713.52.818.7Core
Including12.012.70.765.4 
PGB-17018.821.02.240.0Core
Including20.121.00.994.1 
PGB-1780.06.76.711.1Core
Including0.51.61.117.0 
And Including2.93.81.010.5 
And Including5.96.70.826.4 
PGL-00031.28.57.3198.0Test
Including3.78.54.9296.1 
Including3.74.91.21,147.1 
PGL-00054.96.11.210.1Test

Highlights from the surface program meanwhile contain the following. All surface drilling reported this morning is from the Wedge zone, which is located just under three kilometres by road to the south of the firms processing facility. The zone is viewed as a southwest extension of the current mineral system with the overall structure believed to extend over more than seven kilometres.

  • 66.3 g/t gold over 1.0 metre from drill hole PG20-769;
  • 24.3 g/t gold over 1.0 metre from drill hole PG20-775;
  • 20.5 g/t gold over 1.0 metre from drill hole PG20-766;
  • 16.6 g/t gold over 1.5 metres from drill hole PG20-767;
  • 11.4 g/t gold over 2.0 metres from drill hole PG20-773.

Pure Gold Mining last traded at $2.30 on the TSX Venture.


Information for this briefing was found via Pure Gold Mining and Sedar. The author has no securities or affiliations related to this organization. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

Video Articles

Soma Gold: Q3 Earnings Impacted By Labour Strike

Thesis Gold: The Multi-Billion Dollar Lawyers-Ranch PFS

Why Canada Has So Few Projects That Can Be Built Before 2030 | Dan Wilton – First Mining

Recommended

First Majestic Begins Mine Planning Studies For Two Discoveries At Santa Elena, Names Mani Alkhafaji As President

Steadright To Begin Selling Stockpile Material From Historic Goundafa Mine

Related News

Sprott Sells Majority of Stake In Gran Colombia Gold

Eric Sprott has continued to sell off his holdings in Gran Colombia Gold Corp (TSX:...

Wednesday, August 19, 2020, 07:49:00 AM

Why $10K Gold No Longer Sounds Crazy | Dan Wilton – First Mining Gold

Dan Wilton, CEO of First Mining Gold (TSX: FF), has a front-row seat to what’s...

Thursday, September 18, 2025, 03:40:00 PM

Why Trump and Musk Are Stirring Up Fort Knox Gold Drama

It may have something to do with the debt ceiling....
Monday, February 24, 2025, 04:28:00 PM

CR Capital Releases Glenrock Property July 2020 Exploration Results

CR Capital Corp (TSXV: CIT) this morning announced the results from its July 2020 surface...

Friday, September 11, 2020, 09:30:10 AM

Gold’s New Paradigm! | Shaun Heinrichs – 1911 Gold

Shaun Heinrichs, President and CEO of 1911 Gold Corporation (TSXV: AUMB), thinks we’re still in...

Thursday, September 25, 2025, 01:30:00 PM