Pure Gold Hits 296.1 G/T Gold Over 4.9 Metres In Underground Drilling

Pure Gold Mining (TSXV: PGM) has released results from its ongoing drill program at its flagship Pure Gold Mine in Red Lake, Ontario. Highlights from the program include 296.1 g/t gold over 4.9 metres including 1,147.1 g/t gold over 1.2 metres from underground drilling, as well as 66.3 g/t gold over 1.0 metre from surface drilling.

The company continues to complete ongoing surface exploration at the property as it looks to further expand its mineral resources. The company is targeting both resource upgrades and expansions outside of the current mineral reserves. Underground, the company continues with stope delination drilling in areas targeted for both gold production and first ore delivery from the mine.

Underground drilling is expected to continue for the life of the mine, as the company continually looks to extend mineralization from planned stopes, while also confirming stopes planned for mineralization. On the surface, drilling is expected to continue via two surface rigs, with over 30,000 metres planned for 2021.

Highlights from the underground program include the following.

Hole IDFrom (m)To (m)Length (m)Gold (g/t)Method
PGB-15424.024.50.511.0Core
PGB-15914.214.70.56.9Core
PGB-16510.713.52.818.7Core
Including12.012.70.765.4 
PGB-17018.821.02.240.0Core
Including20.121.00.994.1 
PGB-1780.06.76.711.1Core
Including0.51.61.117.0 
And Including2.93.81.010.5 
And Including5.96.70.826.4 
PGL-00031.28.57.3198.0Test
Including3.78.54.9296.1 
Including3.74.91.21,147.1 
PGL-00054.96.11.210.1Test

Highlights from the surface program meanwhile contain the following. All surface drilling reported this morning is from the Wedge zone, which is located just under three kilometres by road to the south of the firms processing facility. The zone is viewed as a southwest extension of the current mineral system with the overall structure believed to extend over more than seven kilometres.

  • 66.3 g/t gold over 1.0 metre from drill hole PG20-769;
  • 24.3 g/t gold over 1.0 metre from drill hole PG20-775;
  • 20.5 g/t gold over 1.0 metre from drill hole PG20-766;
  • 16.6 g/t gold over 1.5 metres from drill hole PG20-767;
  • 11.4 g/t gold over 2.0 metres from drill hole PG20-773.

Pure Gold Mining last traded at $2.30 on the TSX Venture.


Information for this briefing was found via Pure Gold Mining and Sedar. The author has no securities or affiliations related to this organization. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

Video Articles

SSR Mining Walks Away From a World Class Gold-Copper Project

Why More Canadians Are Starting to Think About Leaving | Jesse Day

Instead of Waiting, This Gold Developer Went Bigger | Kenneth McLeod – Sonoro Gold

Recommended

Amid CBS Shuffle, Is Joe Rogan Replacing Anderson Cooper On 60 Minutes?

Silver47 Targets Resource Growth With 10,000 Metre Red Mountain Drill Program

Related News

O3 Mining Reports 4.7 g/t Gold Over 3.8 Metres At Marban

O3 Mining Inc. (TSXV: OIII) this morning provided an update on its ongoing drill program...

Thursday, July 8, 2021, 08:06:54 AM

Trillium Gold Reports Final 2020 Drill Results For Newman Todd

Trillium Gold Mines (TSXV: TGM) has finally received the last of its drill results from...

Thursday, April 1, 2021, 07:44:08 AM

Zoltan Pozsar: Gold At $3,600 Is Not Improbable If US Refill Reserves With Russian Oil

In his latest dispatch, Credit Suisse contributor Zoltan Pozsar shifted focus on his ongoing series...

Tuesday, December 6, 2022, 10:26:14 AM

Lincoln Gold Announces $750,000 Financing

Lincoln Gold Mining Inc. (TSXV: LMG) today announced a non-brokered private placement offering of up...

Wednesday, June 16, 2021, 09:52:00 AM

Aurelius Minerals Intersects 149.0 G/T Gold Over 0.7 Metres At Aureus East Project

Aurelius Minerals Inc. (TSXV: AUL) released this morning the drilling results from its recently acquired...

Tuesday, August 10, 2021, 12:25:39 PM