Talisker Resources Drills 43.48 G/T Gold Over 1.30 Metres At Bralorne Project

Talisker Resources Ltd. (TSX: TSK) announced today assay results from the company’s flagship Bralorne gold project. The highlighted assays are toplined by an intersect of 43.48 g/t gold over 1.30 metres.

The results announced are focused on the 55 HW and 55 veins, which recently completed the resource drilling program totaling 48 holes.

“With 48 drill holes now intercepting the 55 and 55HW veins, Talisker anticipates that these two structures will form a major component of our upcoming 2022 resource,” said CEO Terry Harbort.

While the report included multiple drill holes, highlighted assays came from a single hole:

  • SB-2021-096: 43.48 g/t gold over 1.30 metres
  • SB-2021-096: 8.43 g/t gold over 3.25 metres
    • including 12.72 g/t gold over 1.50 metres

Currently, there are seven diamond drills operating at the property and 1,434 samples at the assay laboratory still pending results.

Talisker Resources last traded at $0.27 on the TSX.


Information for this briefing was found via Sedar and the companies mentioned. The author has no securities or affiliations related to this organization. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

Leave a Reply

Share
Tweet
Share