Jaguar Mining Halts Operations At Turmalina Mine After Tailings Failure

Jaguar Mining (TSX: JAG) has suspended operations at one of its mines in Brazil following a failure at its tailings pile.

Operations at the Turmalina mine have been suspended, following a slump that occurred in the north wall of the associated Satinoco tailings pile. The pile, which consists of dry-stacked filtered tails and waste rock, failed on Saturday, with the company managing to evacuate personnel and nearby community members before the failure occurred.

Details on the size of the failure have not been provided, however the company indicating that certain infrastructure was impacted by the failure, including the maintenance area near the on-site shop, piping that feeds the filter plant, outdoor storage areas and an emergency exit from the Turmalina mine was covered.

Selkirk Copper Mines — sponsored Sponsored · Selkirk Copper Mines

A total of 134 nearby residents have also been evacuated and placed in local hotels.

The mine is expected to be closed for at least a month, with the timing of resumptions presently unknown. Officials from the company meanwhile are said to be working with local authorities as well as the Brazilian National Mining Agency.

Jaguar’s Turmalina mine last quarter produced 6,479 ounces of gold at an all in sustaining cost of $2,413 per ounce. The mine is the smallest operation in Jaguar’s portfolio in terms of production.

Jaguar Mining last traded at $3.65 on the TSX.


Information for this briefing was found via Sedar and the companies mentioned. The author has no securities or affiliations related to this organization. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

Video Articles

Inside a Forgotten High-Grade Gold Mine in the Yukon | Blue Jay Gold [DD-on-the-GO Ep. 10]

WHICH MINING STOCKS CAN STILL RUN? | Mining Stock Mailbag [Nov. 9-13]

Silver’s Bull Market Isn’t Over | Peter Krauth

Recommended

Goliath Extends Golden Gate Lode 130 Metres With 13.45 g/t Gold Equivalent Over 4.85 Metres

Questcorp Begins 600 Metre Phase 2B Drill Program at La Union

Related News

IAMGOLD Sells Brazilian Exploration Properties To Jaguar Mining

IAMGOLD (TSX: IMG) continues to shed non-core assets as it continues to focus on it’s...

Wednesday, August 2, 2023, 09:14:54 AM

Jaguar Mining Still Evaluating Timing Of Turmalina Restart, Expects Fines For Tailings Slide

Jaguar Mining (TSX: JAG) indicated this morning that operations remain halted at its Turmalina Mine,...

Monday, December 30, 2024, 08:42:24 AM

Jaguar Mining Fined US$52.5 Million For Tailings Collapse In Brazil

Jaguar Mining (TSX: JAG) has been hit with a substantial fine following the collapse of...

Wednesday, January 8, 2025, 08:49:10 AM

These Mining Stocks Have Huge Upside… But Here’s the Catch | Oct. 19-23 – Weekly Mining Mailbag

Welcome to this week’s Mining Stock Mailbag, covering Monday, October 19 through Friday, October 23,...

Saturday, October 24, 2026, 11:06:00 AM

Jaguar Mining Sees Gold Production Fall 20% In Q4 2024

Jaguar Mining (TSX: JAG) this morning released its fourth quarter production results, with the company...

Monday, January 13, 2025, 08:17:23 AM