NG Energy Sees Magico-1X Production Hit 12.2 MMcf/d

NG Energy (TSXV: GASX) this morning is reporting that it has seen steady production volumes from two of its wells at the Sinu-9 Block, with each well producing over 10 MMcf/d of gas.

At Magico-1X, NG Energy saw the well increase production from 7.4 MMcf/d at a 32/64″ choke to 12.2 MMcf/d at a 50.5/64″ choke over a twenty day period. The well is said to have maintained a reduced drawdown of wellhead pressure, with minimal condensate in the gas.

The results are said to have outperformed drillstem tests conducted in August 22, when production rates grew from 5.8 MMcf/d to 10.4 MMcf/d when moving from a 32/64″ choke to a 48/64″ choke.

Selkirk Copper Mines — sponsored Sponsored · Selkirk Copper Mines

After twenty days of production from the Magico-1X well, the well was shut in with production then moved to the Brujo-1X well, which remains producing. Ten days have elapsed since production was moved to Brujo-1X, with production growing from 7.7 MMcf/d at a 30/64″ choke to 10 MMcf/d at a 40/64″ choke. Condensate production averaged 0.15 bbl/day, with the well maintaining a reduced drawdown of wellhead pressure.

Initial production test results of the upper zone at Brujo-1X have also outperformed drillstem tests conducted in August 2022, with lower drawdowns and higher flow rates as the choke increases.

Both wells were found to be in compliance with regulations under the Unified Transportation Regulations.

NG Energy has indicated that production capacity at the gas field will be increased to over 40 MMcf/d by early in the third quarter, once equipment for processing condensates is installed at the central processing facility.

“The last month of production has confirmed that with the right surface solutions and partners, we can unlock one of the most prolific gas reservoirs in Colombia at Sinu-9,” commented Brian Paes-Braga, CEO of NG Energy.

NG Energy last traded at $0.86 on the TSX Venture.


Information for this briefing was found via the sources mentioned. The author has no securities or affiliations related to this organization. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

Video Articles

A $2.2B Gold Project Is Outgrowing Its Plan | Michael Henrichsen – Gold X2 Mining

Pay for the Copper, Get the Gold Free | Rob McEwen – McEwen Inc

This Gold Discovery Was Already Huge. Now It’s Becoming a Monster. | Goliath Resources

Recommended

Golden Cariboo’s First Quesnelle Resource Estimate Tallies 1.19 Million Gold Equivalent Ounces

Brixton Wraps Camp Creek Drilling With 17.58 Metres of 1.47 g/t Gold Equivalent

Related News

NG Energy: Beacon Maintains $2.80 Price Target After Sinu-9 Discovery

Yesterday, NG Energy (TSXV: GASX) announced that it had conducted two successful drillstem tests and...

Wednesday, August 3, 2022, 04:29:00 PM

NG Energy Spuds Second Well At SINU-9 Gas Field

Development of the SINU-9 gas field continues apace for NG Energy International (TSXV: GASX). The...

Friday, September 30, 2022, 08:19:08 AM

NG Energy Looks To Raise $25.0 Million Via Convertible Debentures

NG Energy (TSXV: GASX) is looking to raise fresh capital off the back of yesterday’s...

Friday, October 21, 2022, 08:42:57 AM

NG Energy Completes Maria Conchita Natural Gas Plant

Progress continues for NG Energy International (TSXV: GASX). The firm this morning indicated it has...

Monday, January 17, 2022, 09:25:00 PM

NG Energy: Beacon Reiterates C$2.80 Price Target

On October 7, NG Energy’s (TSXV: GASX) announced that they secured a $7 million, non-brokered...

Tuesday, October 12, 2021, 11:40:00 AM